Sell Construction Datarev. 2026-11-07Get a quote

What construction data counts

Construction data that counts is the record of work in sequence: RFIs with answers, change orders with approvals, revised schedules, daily logs and estimates. Drawings, payroll and anything naming clients or workers stays out unless it is cleaned and you hold the rights.

Get a quoteBuyer categories read 7 November 2026
On this page

Which records count, one by one?#

RecordUseful fieldsUsual problemDefault
RFI logQuestion, discipline, date opened, date answered, cost or time impactAnswers may be design work; attachments carry title blocksInclude text; check answers
Change ordersReason code, scope text, priced lines, markup, approval datesOwner names and signaturesInclude, tokenized
SchedulesActivities, logic ties, baseline against actual, revision notesProject names in file namesInclude
Daily logsManpower by trade, weather, work in place, delays, visitorsWorker names, site addressInclude, cleaned
EstimatesTakeoff quantities, unit costs, assumptions, bid resultBid confidentiality termsInclude if your own
SubmittalsSpec section, review status, comments, resubmission countManufacturer literature is not yoursLog only
Punch and closeoutItem, trade, open and close datesPhotos of occupied spacesInclude text
Meeting minutesDecisions, action owners by role, datesNames of every attendeeInclude, tokenized
SOPs, QA and safety programsProcedures, checklists, inspection formsFew: usually your own workInclude

Where do these records usually live?#

Most firms hold the same project in three or four places. List each before deciding scope; how much a buyer can use depends on whether records from one job can be tied together.

SystemTypical contentsCheck first
ProcoreRFIs, submittals, daily logs, change events, drawings, photosYour subscription terms on data you store
Autodesk Construction CloudModels, sheets, RFIs, issues, submittalsWhich files are the designer's
BuildertrendSchedules, daily logs, change orders, client messagesClient messages name homeowners
AccountingJob cost, pay applications, AP and ARBank and payment details
Spreadsheets and drivesEstimates, logs, trackers, SOPsInconsistent naming across years

This table describes what contractors commonly keep in each system. It makes no claim about any product's export features; ask the vendor or your administrator.

What makes one firm's records more useful than another's?#

  • Years. micro1 says several years of records make a stronger fit; Nyne asks for three years in business.
  • Links between records. An RFI that leads to a change order that moves a schedule activity tells the whole story.
  • Consistency. One system used the same way across projects beats five half-filled ones.
  • English. micro1 says data should be mainly in English.

What should you leave out?#

Leave out

  • Drawings, specifications and models made by the design team.
  • Manufacturer data sheets and product literature in submittals.
  • Certified payroll, timesheets with names, and anything with bank or card details.
  • Incident reports that name people.
  • Any project whose contract makes the records the owner's or keeps them confidential, unless the owner agrees in writing.

What do buyers list, in their own words?#

BuyerCategories that cover contractor records
micro1Lists operations records, SOPs, process documentation, accounting and legal records, internal knowledge bases
Scale AILists files with metadata, warehouse tables, email, calendars, ERP, Jira and Confluence records
NyneLists accounting data (estimates, invoices, AP/AR), jobs and calendars, Asana or Jira projects, service histories
LabelboxLists nothing construction-specific; nearest is cross-system interaction data

Paid-referral notice: a listed buyer may pay this site if one of our introductions ends in a signed license. Rows are sorted by published pay floor; fees play no part in order or wording.

Questions#

Is construction data valuable to AI companies?

Buyers say they want operational records showing work in progress, and a project file is dense with them: questions, decisions, cost changes, schedule revisions, each tied to a date and a role. Prices for construction records specifically: not posted by any buyer at the 2026-11-07 check.

Do RFIs count as training data?

They are among the most useful records a contractor holds, because each one pairs a real field question with a professional answer and a time to answer. The answers may be the design team’s work, so check ownership before including them.

Can I sell data from Procore or Buildertrend?

The records are yours to consider if you own them under your contracts; the software is only where they are kept. Read your software agreement too, and export only what the license agreement with a buyer covers.

What about paper daily logs?

Scanned logs can count, but they need the same review for names and addresses as digital ones, and handwriting makes that slower. Most firms start with the years held in software.

Does one project count, or do I need many?

Buyers describe interest in depth and volume: micro1 calls several years of records a stronger fit. A firm with hundreds of closed projects in one system is a stronger candidate than one with a few.

Sources and read dates: 4 pages

Get a quote

ZIP code first, then a reply address, then a handful of optional facts about your project records. Our answer names each buyer whose posted entry rules your firm clears, and nothing moves further without your say-so.

Disclosure: introduction service, not a buyer. A buyer that signs a license after our introduction may owe us a referral fee; your company is never charged.

Keep project files, exports and samples out of this form. We never take custody of company data or open it.

Step 1 of 3

Where is the company based?

Use the main office. Buyer rules differ by country, so this settles which ones apply.

Get a quote